Command Centre / Pilot · Day 47 · 120 EV trucks · 15 wards
Live · DSCC fleet operations

Good morning, Mahbub.

108 of 120 EV trucks on route. Day 47 of the 15-ward pilot.

শুভ সকাল, মাহবুব। ১২০টির মধ্যে ১০৮টি ইভি ট্রাক বর্তমানে রুটে আছে।
24 alerts
Trucks on route
108/ 120
▲ 90% utilisation · 8 charging
Energy used today
1,842kWh
▼ 14% vs diesel-eq baseline
Collection coverage
87.4%
12,460 / 14,250 stops
CO₂ avoided · MTD
42.8tons
≈ 1,920 tree-equivalents / yr

Live map · 108 EV trucks on route

Pilot · 15 wards · DSCC jurisdiction · heartbeat 5s
Live · heartbeat 5s Geofences shown as circles
On route Idle / low Critical

Today's activity · live

All →
  • Battery critical · 14%

    Demra · 8 km from Depot-Demra · auto-diverted to charge

  • Idle 22m at non-depot

    Sutrapur · driver pinged · supervisor notified

  • Ward 01 Lalbagh complete

    3.2 t collected · 8/8 stops · returning Depot-Lalbagh

  • Regen 2.8 kWh recovered

    Hatirjheel descent · cumulative day 14.6 kWh

  • Charging started · Depot-Jatrabari

    SoC 32% → full ETA 47 min · DC fast-charge bay 03

  • Ward 07 Hazaribagh · 6/8 stops

    S. Karim · driver score 92 · on-time

  • Off-route 320m · Ward 20

    Holiday Mkt diversion · supervisor approved · resumed

  • Compactor cycle ×4

    Ward 14 Gulistan · load factor 78% · normal

Battery state of charge · fleet

120 trucks
0–20%
3
20–40%
11
40–60%
29
60–80%
47
80–100%
30
Avg SoC fleet-wide62.4%
Critical (auto-diverted)1 truck

Top wards · collection today

All wards →
01 · Lalbagh
100%
07 · Hazaribagh
94%
12 · Wari
91%
14 · Gulistan
88%
20 · Holiday Mkt
84%
27 · Hatirjheel
79%
34 · Jatrabari
72%
47 · Shyampur
65%

Charging schedule · next 4h

4 depots
11:30
TRK-EV-031Depot-Jatrabari · DC bay 03
47 min
11:45
TRK-EV-056Depot-Hatirjheel · DC bay 05
38 min
12:10
TRK-EV-076Depot-Demra · DC bay 01 · urgent
52 min
12:30
TRK-EV-008Depot-Lalbagh · AC bay 09 (overnight)
3h 10m
13:00
TRK-EV-024Depot-Hatirjheel · DC bay 02
42 min
13:45
TRK-EV-091Depot-Lalbagh · DC bay 04
35 min