Live · DSCC fleet operations
Good morning, Mahbub.
108 of 120 EV trucks on route. Day 47 of the 15-ward pilot.
শুভ সকাল, মাহবুব। ১২০টির মধ্যে ১০৮টি ইভি ট্রাক বর্তমানে রুটে আছে।
Trucks on route
108/ 120
▲ 90% utilisation · 8 charging
Energy used today
1,842kWh
▼ 14% vs diesel-eq baseline
Collection coverage
87.4%
12,460 / 14,250 stops
CO₂ avoided · MTD
42.8tons
≈ 1,920 tree-equivalents / yr
Live map · 108 EV trucks on route
Pilot · 15 wards · DSCC jurisdiction · heartbeat 5s
On route
Idle / low
Critical
Today's activity · live
All →-
Battery critical · 14%
Demra · 8 km from Depot-Demra · auto-diverted to charge
-
Idle 22m at non-depot
Sutrapur · driver pinged · supervisor notified
-
Ward 01 Lalbagh complete
3.2 t collected · 8/8 stops · returning Depot-Lalbagh
-
Regen 2.8 kWh recovered
Hatirjheel descent · cumulative day 14.6 kWh
-
Charging started · Depot-Jatrabari
SoC 32% → full ETA 47 min · DC fast-charge bay 03
-
Ward 07 Hazaribagh · 6/8 stops
S. Karim · driver score 92 · on-time
-
Off-route 320m · Ward 20
Holiday Mkt diversion · supervisor approved · resumed
-
Compactor cycle ×4
Ward 14 Gulistan · load factor 78% · normal
Battery state of charge · fleet
120 trucks0–20%
3
20–40%
11
40–60%
29
60–80%
47
80–100%
30
Avg SoC fleet-wide62.4%
Critical (auto-diverted)1 truck
Top wards · collection today
All wards →Charging schedule · next 4h
4 depots
11:30
TRK-EV-031Depot-Jatrabari · DC bay 03
47 min
11:45
TRK-EV-056Depot-Hatirjheel · DC bay 05
38 min
12:10
TRK-EV-076Depot-Demra · DC bay 01 · urgent
52 min
12:30
TRK-EV-008Depot-Lalbagh · AC bay 09 (overnight)
3h 10m
13:00
TRK-EV-024Depot-Hatirjheel · DC bay 02
42 min
13:45
TRK-EV-091Depot-Lalbagh · DC bay 04
35 min